Skip to content
EBII Partner Onboarding

Prepare your farm for connected monitoring.

Account registration and logger pairing are handled directly by your Partner Admin or project coordinator—never through unverified open public forms—ensuring strict farm isolation.

Farmer inspecting pond conditions via mobile device
Preparation Checklist

Four essentials to prepare before onboarding activation.

Use the interactive checklist alongside your technical team or partner admin to confirm farm readiness.

0 / 4 · readiness items completed
  • Endpoint telemetri: HTTPS POST /api/iot/telemetry dan wss://ebii-green-system.my.id/mqtt
  • Starter thresholds can be referenced directly from the EBII Water Quality Guide
  • Operational access always requires registered phone number and password authentication

Pond Readiness Checklist